Your browser is not supported. Please download Mozilla Firefox or Google Chrome browser.

coggno-logo2
Course Information arrow

Price Discounts

  • Qty

    Price

  • 1

    $45.00

  • 0

    $45.00

  • 0

    $45.00

  • 0

    $45.00

  • 0

    $45.00

  • 0

    $45.00

27698

Project Delivery Methodology for Water & Wastewater Infrastructure: Design-Build and CMAR

Author: Design Build Institute of America

Category: Online Architecture Training > Construction

Understanding Design-Build and CMAR Project Delivery Methods provides the fundamental framework associated with alternative project delivery methods for the water and wastewater infrastructure. It is intended to provide knowledge and information about: The potential benefits and advantages, as...

Keywords: alternative project delivery, design-bid-build, lump sum, progressive, options, guaranteed max price, owners, best value; rigk, priorities, criteria, permitting, design-build, design/build, design build, design and build, design/construct, "turnkey, " engineer-procure, construct, engineer, procure, DBIA, DBIA Training, Design-Build Institute, single source responsibility, design-build-finance, design build dateline, design build and sustainable design, acquisition, acquisition planning, best value selection, BVS, acquisition model, acquisition strategy, collaboration, Procurement Methods, Contract Types, Sustainability, Sustainable Toolkit, Sustainable Design, Sustainable Design-Build, Sustainable Resources, resources, Consumption, World Energy, Building Energy Use, Green Design, Life Cycle Costing, Building Impact, Sustainable Codes, Sustainability Standards, standards, Incentives, LEED, LEED Certification, Green Rating Systems, Green Globes, LEED Details, IgCC Details, Building Codes, Government Mandates, Building Siting, Natural Ventilation, Material Selection, Energy Consumption, Daylighting, Greenwashing, BIM, Energy Models, Whole Building Performance, Life Cycle Analysis, Integrated Team, Value Engineering, Charrettes, Recycled Content

Read More
Buy this course
$45.00

Per License

Enter no. of units to buy
Total Payment Required$45.00 Add to Cart
Table of Contents:

Introduction
Terminology
Project Delivery Options
Advantages/Disadvantages
Decision Considerations
Decision-Making Criteria
Success Factors
About WDBC

Comments:

10 0 5 2
Michael Wolan Michael Wolan said:

I am annoyed that the course takes 88 minutes and I only get 1 hour of education credit from DBIA. This is decidely unfair that I must sit in for an additional 28 minutes and receive zero credit for it. I would understand if the class was 75 minutes or so since you need to round somewhere but 88! Unreasonable. Soured my whole opinion of the course.

posted about 4 years ago
Debra Hao Debra Hao said:

Some of the graphics were hard to read. Lighten up the background on the slides.

posted about 4 years ago
Included Modules:
  • 21989

    DBIA Introduction by Lisa Washington

  • 27697

    Project Delivery Methodology Water & Wastewater Infrastructure - Video Segment Understanding Design-Build and CMAR Project Delivery Methods provides the fundamental framework associated with alternative project delivery methods for the water and wastewater infrastructure. It is intended to provide knowledge and information about: The potential benefits and advantages, a... more

  • 27695

    Project Delivery Methodology Water & Wastewater Infrastructure - DB & CMAR - Final Exam

Attachments
  • Icon-pdf
  • Best Value Selection

    DBIA Position Statement

  • 2.31 MB
  • Icon-pdf
  • Contract Incentives and Design-Build Rethinking Acquisition Strategies

    DBIA Position Statement

  • 1.13 MB
  • Icon-pdf
  • Design Excellence

    DBIA Position Statement

  • 952.87 KB
  • Icon-pdf
  • Integrated Project Delivery

    DBIA Position Statement

  • 2.49 MB
  • Icon-pdf
  • Organization of DB Entity

    DBIA Position Statement

  • 3.58 MB
  • Icon-pdf
  • Role of Qualification in Selection of a Design Builder

    DBIA Position Statement

  • 1.49 MB
  • Icon-pdf
  • Use of Stipeneds

    DBIA Position Statement

  • 6.36 MB
  • Icon-pdf
  • Project Delivery Methods for Water & Wastewater Infrastructure: DB & CMAR: PowerPoint Notes Pages

    PowerPoint Notes Pages

  • 4.98 MB
  • Icon-pdf
  • Charles "Chuck" Williams Presenter Bio

    Chuck Williams Presenter Bio

  • 24 KB
  • Icon-pdf
  • Water and Wastewater Design-Build Handbook

    Link to Water Design Build Council's "Water and Wastewater Design-Build Handbook"