Description
This recorded webinar explains how to design glazing systems that comply with the DoD antiterrorism and force protection criteria in UFC 4-010-01, Standard 10 (Windows and Skylights).
What this course covers:
- The purpose of UFC 4-010-01 Standard 10 and how it mitigates hazards from non-blast-resistant windows and skylights
- Key changes to the updated criteria and their design implications
- Reference documents and tools that support window and skylight design for DoD facilities
- Case studies across Design-Build, Design-Bid-Build, and window vendor projects
- How other UFC 4-010-01 standards interact with Standard 10 requirements
Earns 1.5 PDHs / 1.5 AIA LU/HSW.
System Requirements
See System Requirements in the Coggno Knowledge Base
Author
SAME provides Professional Development and Technical Training for engineering, construction, and military professionals. Their courses focus on Project Management, Leadership, and Compliance with industry standards. Training emphasizes collaboration, innovation, and applied technical skills. SAME supports both civilian and defense sectors by strengthening professional capabilities. Their content helps learners apply knowledge directly to engineering and infrastructure projects.
Designing Glazing Systems Under the Updated UFC 4-010-01, ATFP Requirements
Attachments:
PDF of Presentation - UFC (2.1 MB)
Frequently Asked Questions
This course is designed for employees who need to complete Designing Glazing Systems Under the Updated UFC 4-010-01, ATFP Requirements training
Yes. This course is designed to meet applicable federal requirements and commonly mandated state standards. Always confirm specific state or industry requirements with your local regulations.
The course takes approximately 82 minutes to complete and can be paused and resumed at any time.
Yes. Learners receive a downloadable certificate upon successful completion, which can be used for compliance records and audits.
Yes. You can assign this course to individuals or groups using Coggno’s LMS, or purchase multiple seats for your team.
Yes. This course can be exported for delivery in most learning management systems (SCORM compatible).
Yes. The course is fully self-paced and available 24/7.
Yes. This course includes a knowledge check to reinforce learning and verify completion.
Learners have lifetime access from the date of purchase.
Yes. A preview is available so you can review the course format and content before purchasing.
Yes. Content is reviewed and updated as regulations and best practices change.
No. This course is not included with the Prime Subscription and must be purchased separately.
Yes. Refund requests can be submitted within 30 days of purchase.
Originally Presented: July 9, 2015
Course Length: 1.5 Hours
Course Credit Hours: 1.5 PDHs, 1.5 AIA LU/HSW
Moderator: Rad Delaney, AIA, F. SAME, CDM Smith
Speakers:
Jeffrey Nielsen, P.E., HQ AFCEC/COSC
Lynne Bregmann, P.E., Hinman Consulting Engineers, Inc.
The DoD Antiterrorism/Force Protection Document (UFC 4-010-01) is a design criteria required to be considered on all DoD facilities. Standard 10, Windows and Skylights contains the design criteria for mitigating the hazards caused by non-blast resistant windows and skylights.
• This webinar provides additional detail on how to comply with the DOD blast resistant window and skylight criteria. The first part of the presentation will focus on the main changes to the criteria and discuss the implications of these changes. Highlight other reference and tools available to assist in designing windows for DoD facilities.
• The second part of the presentation provides case studies and specific examples of how the Stand 10 criteria has been interrupted and implemented for various types of DOD projects including Design-Build, Design-Bid-Build, and Window Vendor work. The project examples not only highlight the implementation of Standard 10 but how other design decisions and UFC 4-010-01 Standards affect the Standard 10 requirements.